 |
 |
| Packaging |
| Plants |
| and
|
| Equipment |
| |
©
2003 ZYI CORPORATION |
- Reliable,
uniform drying of the material to avoid formation of lumps
during melting.
- Careful
melting of the granules with precisely controlled increase
in temperature to prevent gas evolution and changes to the
molecular structure of the material.
- Steady
material transport by the worm screw ensures uniformity
and reliable processing of the material to prevent faults
in the preform, such as, crystalloid.
- Accurately
formed sprues ensure even distribution of the material in
the critical bottom area.
- Elimination
of burrs by controlled process, reducing rejects.
- Smooth
and brilliant surfaces.
| Models |
Injection Cavities |
Preform Wall Thickness |
Output
PPH |
|
IBS-250 |
8 |
2.5
- 4 mm |
960
- 1440 |
|
IBS-350 |
16 |
2.5
- 4 mm |
1920
- 2880 |
|
IBS-550 |
32 |
2.5
- 4 mm |
3840
- 5760 |
|
|